Tips for commercial and industrial lighting project applications


To make sure your commercial and industrial lighting project applications are processed and approved as quickly as possible, double check your paperwork for these requirements:

  • In the lighting tool, on the 103L tab, enter the manufacturer name and complete part number for each line
  • In the lighting tool, fill in the entire T8 lamp and ballast part numbers
  • In the lighting tool, complete every field on the 100L tab
  • Provide complete LED spec sheets and QPL listings
  • Use the wattages listed on the spec sheets, not the DLC listing
  • For custom controls, provide specs and explanation

Energy Trust is here to help. For more information, contact your project coordinator:

  • Gwen Lusk at 503.639.8899
  • Angeline Sanford at 503.557.7160
  • Lisa Hull at 503.559.7379
  • Kelly Zillman at 503.380.9781